Rosemount - Nininger (GRE) 115 kV line (J2652)

Rosemount - Nininger (GRE) 115 kV line is a 197.0 MW battery interconnection project in Dakota, Minnesota with a current status of withdrawn. It is proposed to connect at Rosemount - Nininger (GRE) 115 kV line.

197.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameRosemount - Nininger (GRE) 115 kV line
Queue IDJ2652
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity197.0 MW
StateMinnesota
CountyDakota
Point of interconnectionRosemount - Nininger (GRE) 115 kV line
Requested (queue) date2022-09-15
Proposed in-service date2026-05-01
Operational date2026-05-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata