Ross Storage (26INR0156)

Ross Storage is a 511.0 MW other interconnection project in Refugio, Texas with a current status of operational. It is proposed to connect at tap the 345 kV Angstrom (#8249) – Static (#8676) line; AEP.

511.0 MWCapacity
OperationalStatus
RefugioMarket
OtherTechnology

Project facts

Canonical nameRoss Storage
Queue ID26INR0156
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketRefugio
TechnologyOther
Capacity511.0 MW
StateTexas
CountyRefugio
Point of interconnectiontap the 345 kV Angstrom (#8249) – Static (#8676) line; AEP
Requested (queue) date2023-08-14
Proposed in-service date
Operational date2027-07-31
Withdrawn date
DeveloperS&R SOLAR DESIGN CORP
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.