Russell 115 kV substaition (AFS NJG-2026-004)
Russell 115 kV substaition is a 15.0 MW other interconnection project in Russell, Kansas with a current status of unknown. It is proposed to connect at Russell 115 kV substaition.
15.0 MWCapacity
UnknownStatus
KSMarket
OtherTechnology
Project facts
| Canonical name | Russell 115 kV substaition |
|---|---|
| Queue ID | AFS NJG-2026-004 |
| Status | unknown |
| Source status | — |
| Market | KS |
| Technology | Other |
| Capacity | 15.0 MW |
| State | Kansas |
| County | Russell |
| Point of interconnection | Russell 115 kV substaition |
| Requested (queue) date | 2026-02-26 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | SPEC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-19 | new_project | — | unknown | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.