Russell Biomass (135)

Russell Biomass is a 55.0 MW other interconnection project in Hampden, Massachusetts with a current status of withdrawn. It is proposed to connect at Blanford - Southwick - Elm 115 kV line.

55.0 MWCapacity
WithdrawnStatus
WMAMarket
OtherTechnology

Project facts

Canonical nameRussell Biomass
Queue ID135
Statuswithdrawn
Source statusW
MarketWMA
TechnologyOther
Capacity55.0 MW
StateMassachusetts
CountyHampden
Point of interconnectionBlanford - Southwick - Elm 115 kV line
Requested (queue) date2005-08-19
Proposed in-service date2015-08-01
Operational date
Withdrawn date2012-03-15
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata