RUSSELL CITY ENERGY CENTER (45)

RUSSELL CITY ENERGY CENTER is a 354.0 MW gas interconnection project in Alameda, California with a current status of operational. It is proposed to connect at Eastshore Substation 230kV.

354.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameRUSSELL CITY ENERGY CENTER
Queue ID45
Statusoperational
Source statusCOMPLETED
Market
TechnologyGas
Capacity354.0 MW
StateCalifornia
CountyAlameda
Point of interconnectionEastshore Substation 230kV
Requested (queue) date2004-12-01
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.