Russell - Lake Pauline 138 kV Line is a 67.5 MW solar interconnection project in Hardeman County, Texas with a current status of withdrawn. It is proposed to connect at Russell - Lake Pauline 138 kV Line.

67.5 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameRussell - Lake Pauline 138 kV Line
Queue IDGEN-2017-101
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity67.5 MW
StateTexas
CountyHardeman County
Point of interconnectionRussell - Lake Pauline 138 kV Line
Requested (queue) date2017-07-10
Proposed in-service date2020-04-30
Operational date
Withdrawn date2022-03-14
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata