S Berwick - Galion 345 kV (AG2-148 - moved to TC2)

S Berwick - Galion 345 kV is a 86.0 MW battery interconnection project in Wyandot, Ohio with a current status of withdrawn.

86.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameS Berwick - Galion 345 kV
Queue IDAG2-148 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity86.0 MW
StateOhio
CountyWyandot
Point of interconnection
Requested (queue) date2021-02-22
Proposed in-service date2028-12-31
Operational date
Withdrawn date2025-11-27
Developer
Utility / transmission ownerAEP

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata