S Ce om opin eo rl ae iE vl ee ,c It nr cic (027108)
S Ce om opin eo rl ae iE vl ee ,c It nr cic is a 640.0 MW gas interconnection project in Hardee, Florida with a current status of active. It is proposed to connect at Vandolah Substation 230 kV.
640.0 MWCapacity
ActiveStatus
FLMarket
GasTechnology
Project facts
| Canonical name | S Ce om opin eo rl ae iE vl ee ,c It nr cic |
|---|---|
| Queue ID | 027108 |
| Status | active |
| Source status | Operation |
| Market | FL |
| Technology | Gas |
| Capacity | 640.0 MW |
| State | Florida |
| County | Hardee |
| Point of interconnection | Vandolah Substation 230 kV |
| Requested (queue) date | 1999-10-28 |
| Proposed in-service date | 2002-06-02 |
| Operational date | — |
| Withdrawn date | — |
| Developer | S&R SOLAR DESIGN CORP |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata