S Ce om opin eo rl ae iE vl ee ,c It nr cic (027108)

S Ce om opin eo rl ae iE vl ee ,c It nr cic is a 640.0 MW gas interconnection project in Hardee, Florida with a current status of active. It is proposed to connect at Vandolah Substation 230 kV.

640.0 MWCapacity
ActiveStatus
FLMarket
GasTechnology

Project facts

Canonical nameS Ce om opin eo rl ae iE vl ee ,c It nr cic
Queue ID027108
Statusactive
Source statusOperation
MarketFL
TechnologyGas
Capacity640.0 MW
StateFlorida
CountyHardee
Point of interconnectionVandolah Substation 230 kV
Requested (queue) date1999-10-28
Proposed in-service date2002-06-02
Operational date
Withdrawn date
DeveloperS&R SOLAR DESIGN CORP
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata