S. Harrington-N. Seaford 138kV (X2-066)

S. Harrington-N. Seaford 138kV is a 312.0 MW gas interconnection project in Sussex, Delaware with a current status of withdrawn.

312.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameS. Harrington-N. Seaford 138kV
Queue IDX2-066
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity312.0 MW
StateDelaware
CountySussex
Point of interconnection
Requested (queue) date2011-07-18
Proposed in-service date2016-06-01
Operational date
Withdrawn date2015-01-15
Developer
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.