s He He ols ldto inn ge ,E Ln Le Crgy (034628)

s He He ols ldto inn ge ,E Ln Le Crgy is a 74.5 MW solar interconnection project in Hamilton, Florida with a current status of withdrawn. It is proposed to connect at River Plant to Twin Lakes.

74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical names He He ols ldto inn ge ,E Ln Le Crgy
Queue ID034628
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyHamilton
Point of interconnectionRiver Plant to Twin Lakes
Requested (queue) date2019-04-12
Proposed in-service date2023-05-30
Operational date
Withdrawn date
DeveloperS&R SOLAR DESIGN CORP
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata