S Loving 115 kV Substation is a 115.0 MW battery interconnection project in Eddy, New Mexico with a current status of operational. It is proposed to connect at S Loving 115 kV Substation.

115.0 MWCapacity
OperationalStatus
NMMarket
BatteryTechnology

Project facts

Canonical nameS Loving 115 kV Substation
Queue IDGEN-2024-295
Statusoperational
Source statusDISIS STAGE
MarketNM
TechnologyBattery
Capacity115.0 MW
StateNew Mexico
CountyEddy
Point of interconnectionS Loving 115 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date
Operational date2029-12-10
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata