S1247 161 kV Substation (GEN-2024-372)

S1247 161 kV Substation is a 250.0 MW battery interconnection project in Douglas, Nebraska with a current status of operational. It is proposed to connect at S1247 161 kV Substation.

250.0 MWCapacity
OperationalStatus
NEMarket
BatteryTechnology

Project facts

Canonical nameS1247 161 kV Substation
Queue IDGEN-2024-372
Statusoperational
Source statusDISIS STAGE
MarketNE
TechnologyBattery
Capacity250.0 MW
StateNebraska
CountyDouglas
Point of interconnectionS1247 161 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date
Operational date2027-12-01
Withdrawn date
Developer
Utility / transmission ownerOPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata