S1263 Brock 161kV substation (GEN-2019-009)

S1263 Brock 161kV substation is a 100.0 MW solar interconnection project in Nemaha, Nebraska with a current status of withdrawn. It is proposed to connect at S1263 Brock 161kV substation.

100.0 MWCapacity
WithdrawnStatus
NEMarket
SolarTechnology

Project facts

Canonical nameS1263 Brock 161kV substation
Queue IDGEN-2019-009
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologySolar
Capacity100.0 MW
StateNebraska
CountyNemaha
Point of interconnectionS1263 Brock 161kV substation
Requested (queue) date2019-04-24
Proposed in-service date2029-11-01
Operational date
Withdrawn date2026-03-23
Developer
Utility / transmission ownerOPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata