S1281 – S1362 161kV (S1363) (GEN-2020-027)

S1281 – S1362 161kV (S1363) is a 50.0 MW solar interconnection project in Sarpy County, Nebraska with a current status of withdrawn. It is proposed to connect at S1281 – S1362 161kV (S1363).

50.0 MWCapacity
WithdrawnStatus
NEMarket
SolarTechnology

Project facts

Canonical nameS1281 – S1362 161kV (S1363)
Queue IDGEN-2020-027
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologySolar
Capacity50.0 MW
StateNebraska
CountySarpy County
Point of interconnectionS1281 – S1362 161kV (S1363)
Requested (queue) date2020-04-29
Proposed in-service date2024-05-31
Operational date
Withdrawn date2024-03-11
Developer
Utility / transmission ownerOPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.