S1299 5 161 kV Substation (GEN-2024-179)

S1299 5 161 kV Substation is a 199.0 MW battery interconnection project in Douglas, Nebraska with a current status of withdrawn. It is proposed to connect at S1299 5 161 kV Substation.

199.0 MWCapacity
WithdrawnStatus
NEMarket
BatteryTechnology

Project facts

Canonical nameS1299 5 161 kV Substation
Queue IDGEN-2024-179
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyBattery
Capacity199.0 MW
StateNebraska
CountyDouglas
Point of interconnectionS1299 5 161 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date2029-01-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerOPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata