S1399 161kV (GEN-2008-119O)

S1399 161kV is a 60.0 MW wind interconnection project in Richardson County, Nebraska with a current status of operational. It is proposed to connect at S1399 161kV.

60.0 MWCapacity
OperationalStatus
NEMarket
WindTechnology

Project facts

Canonical nameS1399 161kV
Queue IDGEN-2008-119O
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketNE
TechnologyWind
Capacity60.0 MW
StateNebraska
CountyRichardson County
Point of interconnectionS1399 161kV
Requested (queue) date2008-10-08
Proposed in-service date
Operational date2009-12-31
Withdrawn date
Developer
Utility / transmission ownerOPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata