Sac County – Buena Vista 69 kV line (ASGI-2017-001)

Sac County – Buena Vista 69 kV line is a 4.0 MW other interconnection project in Alta, Iowa with a current status of operational. It is proposed to connect at Sac County – Buena Vista 69 kV line.

4.0 MWCapacity
OperationalStatus
IAMarket
OtherTechnology

Project facts

Canonical nameSac County – Buena Vista 69 kV line
Queue IDASGI-2017-001
Statusoperational
Source statusDISIS STAGE
MarketIA
TechnologyOther
Capacity4.0 MW
StateIowa
CountyAlta
Point of interconnectionSac County – Buena Vista 69 kV line
Requested (queue) date2017-04-28
Proposed in-service date
Operational date2017-12-31
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata