Saddleback BESS2 (65834_SDBTD)

Saddleback BESS2 is a 9.9 MW other interconnection project in Reeves, Texas with a current status of active.

9.9 MWCapacity
ActiveStatus
ERCOMarket
OtherTechnology

Project facts

Canonical nameSaddleback BESS2
Queue ID65834_SDBTD
Statusactive
Source status(TS) Construction complete, but not yet in commercial operation
MarketERCO
TechnologyOther
Capacity9.9 MW
StateTexas
CountyReeves
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-10-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerHEN Infrastructure, L.L.C.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-02proposed_online_date2026-09-012026-10-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata