SALADO SOLAR is a 20.0 MW solar interconnection project in Stanislaus, California with a current status of withdrawn. It is proposed to connect at Salado-Miller 115kV line.

20.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameSALADO SOLAR
Queue ID629
Statuswithdrawn
Source statusWITHDRAWN
Market—
TechnologySolar
Capacity20.0 MW
StateCalifornia
CountyStanislaus
Point of interconnectionSalado-Miller 115kV line
Requested (queue) date2010-05-20
Proposed in-service date—
Operational date—
Withdrawn date2011-02-09
Developer—
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.