Salix-Claysburg 115kV (N49)
Salix-Claysburg 115kV is a 90.0 MW wind interconnection project in Cambria, Pennsylvania with a current status of withdrawn.
90.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology
Project facts
| Canonical name | Salix-Claysburg 115kV |
|---|---|
| Queue ID | N49 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Wind |
| Capacity | 90.0 MW |
| State | Pennsylvania |
| County | Cambria |
| Point of interconnection | — |
| Requested (queue) date | 2005-01-31 |
| Proposed in-service date | 2006-11-01 |
| Operational date | — |
| Withdrawn date | 2005-04-14 |
| Developer | — |
| Utility / transmission owner | PENELEC |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.