Salt-Lick Solar (26INR0277)

Salt-Lick Solar is a 453.0 MW solar interconnection project in Culberson, Texas with a current status of operational. It is proposed to connect at Elcor_8 bus # 11198 .

453.0 MWCapacity
OperationalStatus
CulbersonMarket
SolarTechnology

Project facts

Canonical nameSalt-Lick Solar
Queue ID26INR0277
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCulberson
TechnologySolar
Capacity453.0 MW
StateTexas
CountyCulberson
Point of interconnection Elcor_8 bus # 11198
Requested (queue) date2023-10-13
Proposed in-service date
Operational date2028-06-01
Withdrawn date
DeveloperSalt-Lick Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.