Saltsburg-Vandergrift 138 kV (AI1-162)

Saltsburg-Vandergrift 138 kV is a 100.0 MW battery interconnection project in Armstrong, Pennsylvania with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameSaltsburg-Vandergrift 138 kV
Queue IDAI1-162
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity100.0 MW
StatePennsylvania
CountyArmstrong
Point of interconnection
Requested (queue) date2022-09-09
Proposed in-service date2026-09-15
Operational date
Withdrawn date2025-03-11
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata