San Gabriel Storage (28INR0191)

San Gabriel Storage is a 127.5 MW other interconnection project in Milam, Texas with a current status of operational. It is proposed to connect at Tap 138 kV 3750 Vosslake - 3749 Buckholts.

127.5 MWCapacity
OperationalStatus
MilamMarket
OtherTechnology

Project facts

Canonical nameSan Gabriel Storage
Queue ID28INR0191
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMilam
TechnologyOther
Capacity127.5 MW
StateTexas
CountyMilam
Point of interconnectionTap 138 kV 3750 Vosslake - 3749 Buckholts
Requested (queue) date2025-01-28
Proposed in-service date
Operational date2028-07-01
Withdrawn date
DeveloperSan Gabriel Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata