SAN JOAQUIN 1 & 2 (587)

SAN JOAQUIN 1 & 2 is a 106.8 MW gas interconnection project in Fresno, California with a current status of withdrawn. It is proposed to connect at Gates Substation .

106.8 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameSAN JOAQUIN 1 & 2
Queue ID587
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity106.8 MW
StateCalifornia
CountyFresno
Point of interconnectionGates Substation
Requested (queue) date2010-02-01
Proposed in-service date
Operational date
Withdrawn date2010-03-22
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.