San Jose Rail 138kV (J1882)

San Jose Rail 138kV is a 45.0 MW battery interconnection project in Tazewell, Illinois with a current status of operational. It is proposed to connect at San Jose Rail 138kV.

45.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameSan Jose Rail 138kV
Queue IDJ1882
Statusoperational
Source statusPending Transfer
Market
TechnologyBattery
Capacity45.0 MW
StateIllinois
CountyTazewell
Point of interconnectionSan Jose Rail 138kV
Requested (queue) date2022-03-28
Proposed in-service date2024-09-15
Operational date2024-09-15
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata