San Juan Tap 230 kV Substation (GEN-2022-014)

San Juan Tap 230 kV Substation is a 400.0 MW solar interconnection project in Chavez, New Mexico with a current status of withdrawn. It is proposed to connect at San Juan Tap 230 kV Substation.

400.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameSan Juan Tap 230 kV Substation
Queue IDGEN-2022-014
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity400.0 MW
StateNew Mexico
CountyChavez
Point of interconnectionSan Juan Tap 230 kV Substation
Requested (queue) date2022-06-08
Proposed in-service date2025-12-30
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata