Chavez County, New Mexico — Interconnection Projects
The interXdata warehouse tracks 3 interconnection projects in Chavez, New Mexico, representing 875 MW of requested capacity.
3Total projects
0Active
0Operational
3Withdrawn
875 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 700 MW |
| Battery | 1 | 175 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| San Juan Tap 230 kV Substation | GEN-2022-014 | Solar | 400.0 MW | withdrawn | Chavez, New Mexico |
| San Juan Tap 230kv substation | GEN-2022-022 | Solar | 300.0 MW | withdrawn | Chavez, New Mexico |
| San Juan Tap 230kv substation | GEN-2022-023 | Battery | 175.0 MW | withdrawn | Chavez, New Mexico |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Chavez County.
Start tracking with interXdata