San Leandro 10 - sleba702 (69609_EB702)

San Leandro 10 - sleba702 is a 1.0 MW solar interconnection project in Alameda, California with a current status of active.

1.0 MWCapacity
ActiveStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameSan Leandro 10 - sleba702
Queue ID69609_EB702
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketCISO
TechnologySolar
Capacity1.0 MW
StateCalifornia
CountyAlameda
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-05-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPrologis Logistics Services Incorporated

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-02proposed_online_date2027-01-012027-05-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata