San Perlita BESS 2 (23INR0497)

San Perlita BESS 2 is a 150.0 MW battery interconnection project in Willacy, Texas with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
WillacyMarket
BatteryTechnology

Project facts

Canonical nameSan Perlita BESS 2
Queue ID23INR0497
Statuswithdrawn
Source status—
MarketWillacy
TechnologyBattery
Capacity150.0 MW
StateTexas
CountyWillacy
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2026-08-07
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30developerRWE Renewables—low
2026-09-30poi_name8601 Cebolla 345kV—low
2026-09-30phaseSS Completed, FIS Started, No IA—low
2026-09-30operational_date2025-12-15—medium
2026-09-30withdrawn_date—2026-08-07high
2026-09-30statusoperationalwithdrawnhigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.