San Perlita BESS 2 (23INR0497)

San Perlita BESS 2 is a 150.0 MW other interconnection project in Willacy, Texas with a current status of operational. It is proposed to connect at 8601 Cebolla 345kV.

150.0 MWCapacity
OperationalStatus
WillacyMarket
OtherTechnology

Project facts

Canonical nameSan Perlita BESS 2
Queue ID23INR0497
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketWillacy
TechnologyOther
Capacity150.0 MW
StateTexas
CountyWillacy
Point of interconnection8601 Cebolla 345kV
Requested (queue) date2022-06-02
Proposed in-service date
Operational date2025-12-15
Withdrawn date
DeveloperRWE Solar Development, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.