SAND HILL C (1363)
SAND HILL C is a 80.8 MW wind interconnection project in Alameda, California with a current status of active. It is proposed to connect at Delta Switching Yard-Tesla 230 kV Line.
80.8 MWCapacity
ActiveStatus
NorthernMarket
WindTechnology
Project facts
| Canonical name | SAND HILL C |
|---|---|
| Queue ID | 1363 |
| Status | active |
| Source status | ACTIVE |
| Market | Northern |
| Technology | Wind |
| Capacity | 80.8 MW |
| State | California |
| County | Alameda |
| Point of interconnection | Delta Switching Yard-Tesla 230 kV Line |
| Requested (queue) date | 2017-05-01 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PGAE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata