Sandburg Substation 138kV Bus (J844)

Sandburg Substation 138kV Bus is a 300.0 MW wind interconnection project in Knox County, Illinois with a current status of operational. It is proposed to connect at Sandburg Substation 138kV Bus.

300.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameSandburg Substation 138kV Bus
Queue IDJ844
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity300.0 MW
StateIllinois
CountyKnox County
Point of interconnectionSandburg Substation 138kV Bus
Requested (queue) date2017-06-16
Proposed in-service date2020-09-01
Operational date2020-09-01
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.