Sandlot (1485)

Sandlot is a 600.0 MW battery interconnection project in Suffolk County, New York with a current status of withdrawn. It is proposed to connect at Northport - Pilgrim 138kV Line (138-679A&B).

600.0 MWCapacity
WithdrawnStatus
KMarket
BatteryTechnology

Project facts

Canonical nameSandlot
Queue ID1485
Statuswithdrawn
Source status0
MarketK
TechnologyBattery
Capacity600.0 MW
StateNew York
CountySuffolk County
Point of interconnectionNorthport - Pilgrim 138kV Line (138-679A&B)
Requested (queue) date2022-12-15
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperSandlot Energy LLC
Utility / transmission ownerLIPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.