Sandow Unit 5 (14INR0069)

Sandow Unit 5 is a 30.0 MW coal interconnection project with a current status of operational. It is proposed to connect at Sandow 170092.

30.0 MWCapacity
OperationalStatus
ERCOTMarket
CoalTechnology

Project facts

Canonical nameSandow Unit 5
Queue ID14INR0069
Statusoperational
Source statusoperational
MarketERCOT
TechnologyCoal
Capacity30.0 MW
State
County
Point of interconnectionSandow 170092
Requested (queue) date2013-09-18
Proposed in-service date2014-10-31
Operational date2014-12-29
Withdrawn date
DeveloperLuminant
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata