Sandwich-Plano 138 kV (AF2-329 - moved to TC1)

Sandwich-Plano 138 kV is a 42.2 MW battery interconnection project in Kendall, Illinois with a current status of withdrawn.

42.2 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameSandwich-Plano 138 kV
Queue IDAF2-329 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity42.2 MW
StateIllinois
CountyKendall
Point of interconnection
Requested (queue) date2020-03-30
Proposed in-service date2023-12-01
Operational date
Withdrawn date2025-01-22
Developer
Utility / transmission ownerComEd

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata