SanPat Solar II (25INR0052)

SanPat Solar II is a 256.2 MW solar interconnection project in San Patricio, Texas with a current status of operational. It is proposed to connect at Tap 345kV 8249 Angstrom – 8659 Naismith.

256.2 MWCapacity
OperationalStatus
San PatricioMarket
SolarTechnology

Project facts

Canonical nameSanPat Solar II
Queue ID25INR0052
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketSan Patricio
TechnologySolar
Capacity256.2 MW
StateTexas
CountySan Patricio
Point of interconnectionTap 345kV 8249 Angstrom – 8659 Naismith
Requested (queue) date2022-02-28
Proposed in-service date
Operational date2027-07-22
Withdrawn date
DeveloperCGRP 04, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata