Savanna Prairie Solar (28INR0164)

Savanna Prairie Solar is a 354.8 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at Tap 345 kV Bus # 60404 Solstice7A - Bus # 76002 L_Bakers5_1Y.

354.8 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameSavanna Prairie Solar
Queue ID28INR0164
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity354.8 MW
State
County
Point of interconnectionTap 345 kV Bus # 60404 Solstice7A - Bus # 76002 L_Bakers5_1Y
Requested (queue) date2024-10-29
Proposed in-service date2028-10-16
Operational date
Withdrawn date
DeveloperSavanna Prairie Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.