Savanna Prairie Storage (28INR0165)
Savanna Prairie Storage is a 114.4 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Tap 345 kV Bus # 60404 Solstice7A - Bus # 76002 L_Bakers5_1Y.
114.4 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology
Project facts
| Canonical name | Savanna Prairie Storage |
|---|---|
| Queue ID | 28INR0165 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 114.4 MW |
| State | — |
| County | — |
| Point of interconnection | Tap 345 kV Bus # 60404 Solstice7A - Bus # 76002 L_Bakers5_1Y |
| Requested (queue) date | 2024-10-29 |
| Proposed in-service date | 2028-10-16 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Savanna Prairie Storage, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata