Sayle Storage SLF (27INR0260)

Sayle Storage SLF is a 122.3 MW other interconnection project in Jackson, Texas with a current status of operational. It is proposed to connect at Tap 69kV #5522 Edna - #5518 El Toro SW.

122.3 MWCapacity
OperationalStatus
JacksonMarket
OtherTechnology

Project facts

Canonical nameSayle Storage SLF
Queue ID27INR0260
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketJackson
TechnologyOther
Capacity122.3 MW
StateTexas
CountyJackson
Point of interconnectionTap 69kV #5522 Edna - #5518 El Toro SW
Requested (queue) date2024-06-03
Proposed in-service date
Operational date2028-05-31
Withdrawn date
DeveloperSayle Storage LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata