Sbranch Solar (22INR0205)

Sbranch Solar is a 233.5 MW solar interconnection project in Wharton, Texas with a current status of operational. It is proposed to connect at Tap 138kV 44190 East Bernard - 44130 Caney.

233.5 MWCapacity
OperationalStatus
WhartonMarket
SolarTechnology

Project facts

Canonical nameSbranch Solar
Queue ID22INR0205
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketWharton
TechnologySolar
Capacity233.5 MW
StateTexas
CountyWharton
Point of interconnectionTap 138kV 44190 East Bernard - 44130 Caney
Requested (queue) date2019-01-03
Proposed in-service date
Operational date2026-07-31
Withdrawn date
DeveloperBernard Creek Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata