Scenic Woods BESS is a 9.9 MW battery interconnection project with a current status of active. It is proposed to connect at Station Name: SCENIC WOODS_x000D_ TSP Station Code: SW_x000D_ Load Transformer Name: LD5_x000D_ Bus #: 46334_x000D_ Voltage in kV (Transmission Level): 138.
Project facts
| Canonical name | Scenic Woods BESS |
|---|---|
| Queue ID | 25INR0712 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | — |
| County | — |
| Point of interconnection | Station Name: SCENIC WOODS_x000D_ TSP Station Code: SW_x000D_ Load Transformer Name: LD5_x000D_ Bus #: 46334_x000D_ Voltage in kV (Transmission Level): 138 |
| Requested (queue) date | 2024-10-10 |
| Proposed in-service date | 2027-04-08 |
| Operational date | — |
| Withdrawn date | — |
| Developer | SMT Houston IV LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata