Scitico DG Cluster (1349)

Scitico DG Cluster is a 5.2 MW solar+battery interconnection project in Hartford, Connecticut with a current status of withdrawn. It is proposed to connect at Eversource Scitico 27H/27H1.

5.2 MWCapacity
WithdrawnStatus
CTMarket
Solar+BatteryTechnology

Project facts

Canonical nameScitico DG Cluster
Queue ID1349
Statuswithdrawn
Source statusW
MarketCT
TechnologySolar+Battery
Capacity5.2 MW
StateConnecticut
CountyHartford
Point of interconnectionEversource Scitico 27H/27H1
Requested (queue) date2023-01-26
Proposed in-service date2023-12-31
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.