Scott (TWP 138/69) 138 kV Substation (J856)

Scott (TWP 138/69) 138 kV Substation is a 80.0 MW solar interconnection project in Vanderburgh County, Indiana with a current status of withdrawn. It is proposed to connect at Scott (TWP 138/69) 138 kV Substation.

80.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameScott (TWP 138/69) 138 kV Substation
Queue IDJ856
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity80.0 MW
StateIndiana
CountyVanderburgh County
Point of interconnectionScott (TWP 138/69) 138 kV Substation
Requested (queue) date2017-06-16
Proposed in-service date2021-04-01
Operational date2021-04-01
Withdrawn date2023-03-07
Developer
Utility / transmission ownerSouthern Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.