Scrap Iron Solar (27INR0379)

Scrap Iron Solar is a 110.8 MW solar interconnection project in Grimes, Texas with a current status of operational. It is proposed to connect at Tap 138kV (#9) Bedias - (#15) Cross .

110.8 MWCapacity
OperationalStatus
GrimesMarket
SolarTechnology

Project facts

Canonical nameScrap Iron Solar
Queue ID27INR0379
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketGrimes
TechnologySolar
Capacity110.8 MW
StateTexas
CountyGrimes
Point of interconnectionTap 138kV (#9) Bedias - (#15) Cross
Requested (queue) date2024-09-10
Proposed in-service date
Operational date2028-09-01
Withdrawn date
DeveloperEnergiekontor US Texas SP 16 LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata