SCU000 El Camino Real Fuel Cell (63715_SCU00)

SCU000 El Camino Real Fuel Cell is a 1.5 MW gas interconnection project in Santa Clara, California with a current status of operational.

1.5 MWCapacity
OperationalStatus
CISOMarket
GasTechnology

Project facts

Canonical nameSCU000 El Camino Real Fuel Cell
Queue ID63715_SCU00
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyGas
Capacity1.5 MW
StateCalifornia
CountySanta Clara
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2018-12-01
Withdrawn date
Developer
Utility / transmission owner2016 ESA Project Company, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata