Sealy BESS (69045_WAL)

Sealy BESS is a 200.0 MW battery interconnection project in Austin, Texas with a current status of operational.

200.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameSealy BESS
Queue ID69045_WAL
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity200.0 MW
StateTexas
CountyAustin
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-07-01
Withdrawn date—
Developer—
Utility / transmission ownerSealy Power, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata