Seminole (FL) (136_CT1)

Seminole (FL) is a 384.2 MW gas interconnection project in Putnam, Florida with a current status of operational.

384.2 MWCapacity
OperationalStatus
SECMarket
GasTechnology

Project facts

Canonical nameSeminole (FL)
Queue ID136_CT1
Statusoperational
Source status(OP) Operating
MarketSEC
TechnologyGas
Capacity384.2 MW
StateFlorida
CountyPutnam
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2023-04-01
Withdrawn date—
Developer—
Utility / transmission ownerSeminole Electric Cooperative

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata