Seminole (FL) (136_ST)

Seminole (FL) is a 414.8 MW gas interconnection project in Putnam, Florida with a current status of operational.

414.8 MWCapacity
OperationalStatus
SECMarket
GasTechnology

Project facts

Canonical nameSeminole (FL)
Queue ID136_ST
Statusoperational
Source status(OP) Operating
MarketSEC
TechnologyGas
Capacity414.8 MW
StateFlorida
CountyPutnam
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-04-01
Withdrawn date
Developer
Utility / transmission ownerSeminole Electric Cooperative

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata