Senaca Sawmill is a 20.0 MW gas interconnection project in Blachly Lane, Oregon with a current status of operational. It is proposed to connect at Blachly Lane Substation.

20.0 MWCapacity
OperationalStatus
ORMarket
GasTechnology

Project facts

Canonical nameSenaca Sawmill
Queue IDG0349
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyGas
Capacity20.0 MW
StateOregon
CountyBlachly Lane
Point of interconnectionBlachly Lane Substation
Requested (queue) date2008-11-18
Proposed in-service date
Operational date2010-10-01
Withdrawn date
DeveloperBlachly-Lane County Cooperative Electric Association
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.