Sepanta Solar is a 218.0 MW solar interconnection project in Nolan, Texas with a current status of operational. It is proposed to connect at 10198 ESKOTA_9 138kV (PSS/E BUS #10198, Station Name: ESKOTA_8, kV: 138 kV) Property is adjacent (West) to the Oncor Sweetwater Eskota Switch #10198. POI would simply be on the other side of the fence of the switch..

218.0 MWCapacity
OperationalStatus
NolanMarket
SolarTechnology

Project facts

Canonical nameSepanta Solar
Queue ID23INR0473
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketNolan
TechnologySolar
Capacity218.0 MW
StateTexas
CountyNolan
Point of interconnection10198 ESKOTA_9 138kV (PSS/E BUS #10198, Station Name: ESKOTA_8, kV: 138 kV) Property is adjacent (West) to the Oncor Sweetwater Eskota Switch #10198. POI would simply be on the other side of the fence of the switch.
Requested (queue) date2022-10-18
Proposed in-service date
Operational date2029-09-18
Withdrawn date
DeveloperBREG - Belgian Renewable Energy Group
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata