SEPV Cuyama Hybrid (66807_CUYA2)

SEPV Cuyama Hybrid is a 1.6 MW solar interconnection project in Santa Barbara, California with a current status of operational.

1.6 MWCapacity
OperationalStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameSEPV Cuyama Hybrid
Queue ID66807_CUYA2
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologySolar
Capacity1.6 MW
StateCalifornia
CountySanta Barbara
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-12-01
Withdrawn date
Developer
Utility / transmission ownerSEPV Cuyama, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata